Engineer Operations
Also stationed in Meiningen in support of
Grenzregiment 9 was a separate engineer company. They provided barrier
related maintenance and construction support to include such tasks as
third generation barrier transitions of both towers and fence systems.
The barrier fence evolution from the parallel fences to the new style
single fence was a simple enough procedure. The de- mining of the
center strip posed many problems. The mines shifted in position due to
frost heaves and erosion; they were not always stable. Although the
smallest anti - personnel mines had been placed, recovery or
detonation proved to be dangerous work for even highly trained
soldiers. A variety of methods were used to include mine rollers and
flails built on T54 chassis. On occasion, it was necessary for soldiers
to search for mines with wooden or fiberglass poles. One tracked
utility vehicle had a large screen built into the side to protect the
engineers as they searched with long poles. At certain times, it was
necessary for the soldiers to dismount and rely on the protection
afforded by special body armor and head - face shields.

De - mining by hand along a second generation fence. Ritter

Tracked engineer vehicle with blast screen. Tartella

Large work camp for third generation fence transition. Ritter

Engineer work party at end of day. Ritter

Work site 2nd to 3rd generation fence. Ritter

Mine roller attached to T54 chassis during conversion from second to
third generation fence, Eaglehorse sector, 1977. Tartella

Truck mounted crane for lifting third generation fence sections into
place, Eaglehorse sector, 1977. Tartella

Used to clear the center strip of mines, this engineer vehicle has a
plow front and a plow / digger at rear. Ritter

Engineer vehicle, Eaglehorse sector, plow on front and mine roller on
rear, elevated in travel position. Ritter

A detail of a rear mounted mine roller device as it pivots into
position. Note the safety cage to trap debris thrown by explosions.
The vehicle would back through the mined strip; the roller detonating
the mines. Ritter

An engineer company " cherry picker " crane performs maintenance on a
second generation tower, Eaglehorse sector. Ritter

Border Troop engineers with detector and probe work a section of second
generation fence. Ritter

Mine explosion. Roland Ansorge

Dangerous duty; a wounded engineer is led to an ambulance, Eaglehorse
sector. Ritter